Nature conservation measures in power generation

All of Hafslund’s power comes from nature—whether from water or wind. We depend entirely on healthy ecosystems, which is why nature is a strategic priority for Hafslund.

cultural heritage environment in Aurland

Hafslund’s operations affect rivers and lakes covering around 1,500 km², as well as 25 km² of land with species and habitats that require sound, knowledge-based management. We have a significant responsibility to understand the impact of our existing infrastructure and to develop new power generation on nature’s terms.

At its existing facilities, Hafslund works systematically to reduce its impact on nature through targeted measures and a stronger knowledge base. This includes extensive mapping of ecological features using digital tools, enabling measures to be prioritised where they will have the greatest effect, as well as ongoing monitoring of environmental conditions and changes over time.

Developing renewable energy requires land and can affect biodiversity. We must therefore continually weigh the need for renewable energy against the consequences of nature loss. Wherever possible, we prioritise upgrading existing power plants over new developments to increase production while limiting further impacts on nature.

Society needs electricity, and demand is growing. In the white paper on nature the development of renewable energy (generation and grids) is one of three priority land-use needs. It states: “Where it is nevertheless appropriate for nature to give way, purposes for which society has a particularly pressing need, such as renewable energy production, must be given the highest priority.” Electricity generation is therefore a legitimate reason for using land.

The priority is to avoid and minimise impacts on nature

We follow the mitigation hierarchy, an integrated approach to taking nature into account at every stage of a project – from identifying a site to bringing the facility into operation.

The most important thing we can do is to avoid areas with significant natural assets and high ecological value. For example, we seek to avoid construction in protected natural areas or where it could negatively affect threatened species. We also work to minimise the impacts of all our projects, at both existing and new facilities.

Where adverse impacts are unavoidable, we will work to restore nature within the project area. For significant adverse impacts that cannot be avoided, mitigated or remedied through restoration, we explore opportunities to offset them through measures that benefit nature elsewhere.

We take an evidence-based approach

Hafslund takes an evidence-based approach to its work on nature. We therefore work closely with research institutions such as NINA, NIVA, SINTEF and NORCE LFI to assess the state of nature, identify effective conservation measures and evaluate their impact.

On these pages, you can read more about some of our projects to enhance nature and the environment in our power generation operations.

Read more about our projects:

How we keep fish away from the turbines

At Vangen hydropower plant, custom-developed fish screens keep sea trout and salmon in the river system—not in the tunnel.

How we protect the peatland at Raskiftet wind farm

Can we build roads through peatlands without compromising their function?

New life for salmon and sea trout in the Aurland River

The Tokvam streams were blocked off and no longer functioning as habitats for a long time, but targeted ecological restoration has restored important spawning and nursery areas in the river.

Natural capital accounting in practice

How can we expand renewable energy while also halting nature loss? The new “Nature Compass” method can help show the way.

How we ensure fish passage at Tolga hydropower plant

With specially designed solutions, Tolga power plant ensures the river thrives even when the turbines are running.

How we help the trout in Lake Savalen

Providing hiding places for young trout increased the number of fish many times over.

Cleaning up after nearly a century of power generation

By removing contaminated concrete pipes from the 1930s at Kroken, we are restoring this walking area to its natural state and ensuring safe access for years to come.

Environmental improvement measures in Aurland

A number of measures have been implemented in the Aurland river system, yielding promising results for fish populations.

37 tonnes on the move – in an electric truck

A new turbine runner and parts for the Faslefoss power plant were transported by electric truck from Finland to Valdres. This is the first time such a heavy load has been transported by electric truck in Norway.

Good numbers for Hunder trout

Research-based environmental measures have increased the number of trout migrating past Hunderfossen from a couple of hundred to over 1,500 fish a year.

Elgsjøvegen – a construction road reclaimed by nature

How do you build a road through fragile high-mountain terrain—and ensure that nature recovers? Elgsjøvegen on Dovrefjell shows that it is possible.

Salamander hotel in Flisa

A newt hotel and other measures saved the area's smooth newts when water was to be diverted from Øvre Flisa to Osensjøen.